Project server switch done
Posted: Sun 16. Apr 2006, 19:39
Hi folks,
I have switched project server today. The system should be faster now because of using MySQL 4.x and PHP 4.4 and Apache 2.2
DNS entries should be updated within next hours.
Use http://www.phpwcms.net to be sure to be connected to the right system.
A test installation is in preparation there too.
Happy testing
Oliver
I have switched project server today. The system should be faster now because of using MySQL 4.x and PHP 4.4 and Apache 2.2
DNS entries should be updated within next hours.
Use http://www.phpwcms.net to be sure to be connected to the right system.
A test installation is in preparation there too.
Happy testing
Oliver